![]() |
| Home | Profile | Portfolio | Sustainability | Contact |
Education K-12
Completed: 2003 Cost: $2.3M Square Footage/Scope: 60,000SF
|
CHRIST CHURCH EPISCOPAL LOWER SCHOOL The challenge of this 60,000 SF renovation design converting a high school to a K-4 school was based on the concept of economy. From the beginning we attempted to reuse as much of the existing 1960's building as possible, while incorporating modern teaching amenities. Each classroom has ample storage and windows; two things missing in the original facility. The conversion design created an environment that is safe and stimulates learning, and provided "commons" areas for shared learning. This project was completed by MKA in association with Little Diversified Architectural Consulting.
|
|---|
| Michael Keeshen & Associates | 101 E. Washington Street | Suite 320 | Greenville, SC 29601 | 864.233.2804 | f: 864.233.6567 |