![]() |
| Home | Profile | Portfolio | Sustainability | Contact |
Education K-12 League Academy
Completed: 2007 Cost: $16.6M Square Footage/Scope: 125,500SF
|
LEAGUE ACADEMY The new League Academy is a 125,500 SF middle school with a core enrollment of 850 students and serves as the Magnet Middle School for Communication Arts. The Academy has various arts studios including band, strings, choral, and drama. The school also includes a 350-seat teaching auditorium. Due to a limited site, the classroom wings are stacked. The building has a precast concrete structural system, as well as a precast exterior wall assembly. These systems were selected for their ability to be brought to the site with little on site staging requirements.
|
|---|
| Michael Keeshen & Associates | 101 E. Washington Street | Suite 320 | Greenville, SC 29601 | 864.233.2804 | f: 864.233.6567 |